Skip to content
Wet methods, HEPA air and sealed waste bags Open 24/7 (516) 585-2406
Asbestos Removal Hempstead logo
Reviewing building plans at a desk

Projects in the city

ACP-5 Filing for Hempstead Owners With City Property

The survey and Asbestos Assessment Report a city building permit usually needs, prepared so your filing is not held up.

Why a City Permit Can Hinge on One Report

Hempstead is in Nassau County, so the ACP-5 does not apply to projects here. Asbestos work in Nassau follows New York State rules, mainly Industrial Code Rule 56. But Queens is right next door, and plenty of owners, landlords, contractors and expediters from this area have buildings or jobs somewhere in the five boroughs. For those projects, the ACP-5 matters a lot. It is the Asbestos Assessment Report, and most Department of Buildings permit applications in the city need one. Before it can be filed, a DEP-certified asbestos investigator surveys the area your work will affect, samples suspect materials and has them analyzed. If nothing regulated will be disturbed, the investigator's signed report goes in alongside the permit application. When asbestos sits where the work is going, the order flips: the abatement goes ahead under a project notification, and the permitted work waits for it. Knowing early which way your job will go saves real trouble, because a missing report is a common reason city renovations stall at the permit stage. We line up the survey with a DEP-certified investigator, get the report prepared and, where abatement is needed, plan the removal so your project can keep its place in line.

What ACP-5 Help Includes

From the first look at your plans to a completed report.

  • Plan review

    Your drawings or scope checked to see which areas the work affects.

  • Certified investigator survey

    A DEP-certified investigator looks over the affected spaces and takes samples.

  • Accredited lab results

    Samples analyzed so the report rests on real data.

  • Report for your filing

    The signed ACP-5, ready for your permit, when the work leaves regulated asbestos alone.

  • Abatement when required

    Project notification and removal handled if asbestos is in the way.

  • Contact with your team

    Updates to your expediter, architect or general contractor as things move.

Getting the ACP-5 Done

  1. Tell us where and what

    Which borough, which building, what the permit covers. Plans or a work description show which spaces need surveying.

  2. Survey and analysis

    A DEP-certified investigator surveys and samples the affected areas, and an accredited lab analyzes the samples.

  3. File or abate

    Nothing regulated in the path: your permit gets the ACP-5. Asbestos in the path: abatement is filed and completed ahead of the permitted work.

Why Owners Bring Us Their City Filings

  • Order of operations handled

    Survey, analysis and report done in the right sequence.

  • Removal in-house if needed

    If asbestos turns up in the survey, one crew can file the notice and take it out.

  • Straight answers on scope

    You find out early whether you are on the report path or the abatement path.

  • DEP-certified survey
  • Lab-backed findings
  • Report prepared for filing
  • Abatement if required

City Permit Stuck on Asbestos Paperwork?

Name the borough and the work you have planned. You will find out whether the ACP-5 or abatement comes first, and how each one gets done.